House in Spain

House construction in Alfarb (Valencia)

Alfarb is a charming village located south of Valencia, surrounded by orange groves and vineyards. It’s an ideal place for those seeking a peaceful lifestyle close to nature yet within easy reach of the sea. House in Spain builds turnkey homes in Alfarb — modern, sustainable, and designed for the local Mediterranean climate.

Types of houses and prices

We build houses - both private and for glamping.
All projects are carried out "turnkey", but without furniture - bring furniture and live!
Technologies and indicative prices per 1 m²:

SLC houses

(metal frame + profiles + foam concrete inside)

from 1,500 €/m²

Glamping houses

from 900 €/m²

SIP VIROC houses

(cement-chipboard with insulation)

from 1,800 €/m²

SIP houses

from 1,000 to 1,300 €/m²

SLT houses

from 1,200 €/m²

Concrete houses

from 2,500 €/m²

Hangars and storage facilities

We build hangars and warehouses all over Spain directly from the manufacturer. These can be hangars for warehouses, food storage, manufacturing, machinery repair or even airplane hangars. Inside we can set up offices with full equipment and electrics, or simple storage boxes. From renovation and construction to lumber and production facilities, we have every need covered.

 

The price ranges from 300 to 900 euros per square meter. You end up with a modern, reliable and energy efficient solution without overpaying. Contact us and we will find the ideal solution for your needs!

Technical characteristics of the houses

Technology

SIP and SLT

SLC

Walls

thickness 100 mm

thickness 120–150 mm

Roof

thickness 150 mm

thickness 160–200 mm

Floor

thickness 120 mm

thickness 150 mm

Insulation

mineral wool

aerated concrete + mineral wool

Exterior wall finish

wood, siding or cement-bonded particle board (CSP)

plaster on mesh, siding, wood or cement-bonded particle board (CSP)

Windows

PVC

PVC with double glazing

Roofing

sandwich panels or quartz

metal tile, sandwich panels or quartz

Foundation

slab, piles or blocks

slab, pile or strip foundation

Engineering systems

electricity and water supply

electricity, water supply and sewage

Heating

air conditioning + electric convectors, optional electric underfloor heating

air conditioning + electric convectors, optional electric underfloor heating

Flooring (finish)

quartz-vinyl or laminate

quartz-vinyl, tiles or laminate

Interior finish

MDF, wood, decorative chipboard lamination or wall laminate

MDF, wood, decorative chipboard lamination or wall laminate

What goes into the job

Design

Foundation

Frame / Structure

Engineering systems

Finishing

Windows

Roofing

Permits

Why with us

Warranties

We provide official warranties on the work performed and materials used.

Timeline

We strictly adhere to the agreed terms of construction - from the project to the delivery of the finished object.

Estimates

We form transparent estimates with no hidden costs so you know the final cost in advance.

Construction features in Alfarb

Alfarb Valencia Construcción de casas

The region is characterized by a mild climate with warm summers and moderate winters, as well as stable soils suitable for pile and slab foundations. The SLC technology used by House in Spain is ideally suited to local conditions: a sturdy metal frame with foam concrete filling provides excellent thermal insulation and protection against moisture.


Such houses are built quickly and maintain a comfortable microclimate all year round, reducing energy costs for heating and cooling. We offer flexible architectural solutions and a wide range of finishes, from minimalism to Mediterranean style.


Construction in Alfarba with House in Spain is a combination of innovation, comfort and reliability in one project.

Timeline and stages

We build turnkey houses with a full cycle of works – from the project and approvals to the finished object, including finishing and connection of communications.

 

Usually the timeframe is from 8 to 12 months, depending on the technology chosen and the complexity of the project.

 

Project approvals can take up to 2-3 months, followed by earthworks, construction of the structure and final finishing.

Get a free consultation
house construction

FOS ENG

Questions and answers

How long does it take to build a turnkey home?

Typically, the entire home construction cycle – from design and approvals to finishing and delivery – takes 8 to 12 months, depending on the technology, project scope and municipal requirements.

This stage includes developing an architectural design, preparing all the necessary drawings and documentation, submitting them to the municipality (ayuntamiento), obtaining a building license and approving the engineering systems. Usually permits take up to 2-3 months, but there is a rule that the project approval period should not exceed 90 days.

Technologies such as SIP panels and SLC systems make it possible to speed up construction considerably. For example, SIP panels are manufactured in advance, which reduces installation time, and SLC technology allows the combination of a metal frame and lightweight concrete, which speeds up infrastructure and construction work.

Yes. House in Spain offers guarantees on the construction, on the finishing work and on the materials used. This is included in the turnkey construction services.

The cost is influenced by such factors as the chosen construction technology (SIP, SLC, concrete, etc.), the complexity of the project, the degree of finishing, the availability of furniture and engineering systems, the type of foundation, the connection of communications, as well as the cost of legal and permit procedures. The involvement of a designer, the quality of materials and additional client requests can also increase the estimate.

All types of houses and turnkey projects await you

We are always available to discuss your project